Solar panels on steel buildings can be part of a long-term plan for a workshop, farm building, warehouse or commercial facility. The most useful time to discuss them is before the steel building and roof design are finalized.
Table of Contents
- Can you put solar panels on a steel building?
- Plan for solar before finalizing the steel building
- Confirm roof loads and structural design
- Review roof layout and access
- Coordinate the mounting system and roof warranty
- Plan electrical work and approvals
- Adding panels to an existing steel building
- Questions to ask before ordering
- Frequently Asked Questions
Can you put solar panels on a steel building?
Solar panels on steel buildings can be considered for new or existing roofs when the building, roof system and proposed installation are assessed together. Suitability depends on the actual structure, panel layout, mounting method, local loads and the condition of the roof.
If you are ordering a new building, tell your supplier about possible solar panels before the design is finalized. For an existing building, have the appropriate professionals review its drawings and condition before committing to an installation.
Plan for solar before finalizing the steel building
Even if installation is years away, early planning lets your project team evaluate the intended solar area alongside the building configuration. Share the project location, building use, roof dimensions, preferred panel location and whether you already have a solar installer or preliminary design. This applies to any building type, from commercial steel buildings to warehouses.
Explain whether the system is planned now or is a future possibility. An allowance for future solar must be defined and confirmed in the building design and quote; it should not be assumed from a general statement that the building is suitable for solar.
Confirm roof loads and structural design
The structural engineer needs information on the panels, mounting hardware and their arrangement. The review may consider the equipment weight and how it is distributed, as well as applicable snow, wind and other loads. Attachment forces and load paths also matter. The design must reflect the specific building and location. Our guide to steel building snow load zones in Canada explains how snow loads vary by location.
Existing equipment and planned additions such as sprinklers, ceilings, ductwork and rooftop units may already contribute loads. Review the overall load assumptions with your building supplier and engineer. Our guide to collateral loads in steel buildings explains why these details should be identified early.
Review roof layout and access
A usable roof area depends on more than the overall building footprint. Roof slope and orientation, shading, vents, skylights, mechanical equipment and access routes can affect where panels fit. Leave the solar designer and relevant authorities to confirm the layout and required clearances for the project.
Discuss maintenance access and the expected life of the roof system with the building supplier and installer. Future roof repairs should be considered before equipment and mounting locations are finalized.
Coordinate the mounting system and roof warranty
Different roof profiles and panel systems require compatible mounting details. The solar installer, roof supplier and structural engineer should confirm the attachment method, loads, fastening locations, waterproofing and compatibility with the specified roof system.
Ask for the roof and installation warranty documents and check what penetrations, attachments, maintenance or third-party work may affect coverage. Do not assume that every clamp or fixing method is suitable for every steel roof.
Plan electrical work and approvals
Solar design may involve electrical capacity, equipment locations, wiring routes, utility connection requirements and permits. Have the solar designer and licensed electrical professionals identify the work and coordinate it with the building plan. Confirm approval requirements with the municipality and other relevant authorities for the actual project.
For example, the City of Waterloo solar permit checklist requests roof framing and panel layout information. Requirements differ by location, so check with your own municipality.
Adding panels to an existing steel building
Gather the original structural and roof drawings, building specifications, records of modifications and the proposed solar layout. Ask a qualified structural engineer to assess the existing framing, connections, roof system and proposed loads. Missing drawings, changes to the building or deterioration can make additional investigation necessary.
Do not install panels based only on the age, size or appearance of the building. Any required strengthening or repair should be designed and completed by the appropriate professionals before installation.
Questions to ask before ordering
- Have we told the supplier about current or potential future solar?
- What panel area, weight and mounting arrangement are assumed?
- Are the design assumptions recorded in the drawings and quotation?
- Who checks the roof panels, structure and connections?
- How will the solar design be coordinated with snow, wind and other loads?
- What do the roof and installation warranties say about attachments?
- Who handles electrical design, utility coordination and approvals?
- What information is required before a future installation can proceed?
Frequently Asked Questions
Can you put solar panels on a steel building?
Potentially, but the building, roof system and proposed mounting arrangement need a project-specific review. A structural engineer and the relevant suppliers should confirm suitability.
Should I plan for solar before ordering a steel building?
If solar is a possibility, discuss it before design is finalized. Provide the best available information and confirm any future allowance in the design and quotation.
Can an existing steel building support solar panels?
Some existing buildings may be suitable, but capacity cannot be assumed. A qualified engineer should review the structure, condition and proposed system before installation.
Do solar panels affect a steel roof warranty?
They may affect coverage depending on the roof system, mounting method, warranty terms and installation. Review the applicable written documents with the roof supplier and installer.
Will I need a permit for rooftop solar?
Requirements depend on the project and location. Confirm building, electrical and utility requirements with the responsible authorities and qualified professionals.
Planning a Solar Ready Steel Building?
Share your building location, intended use, approximate dimensions and solar plans. Tower Steel Buildings can discuss the building requirements and prepare a project-specific quote.
