A steel building is one of the most practical ways to add a shop, garage, farm building or commercial space in Manitoba. Before you order, it helps to know who issues the permit, which code applies and what the building department will want to see. This guide walks through steel building permits in Manitoba, from Winnipeg to rural municipalities, including the rules that apply to farm buildings.
Planning a project in Manitoba? Our steel buildings in Manitoba page covers common building types, local design conditions and how we quote across the province.
Table of Contents
Who issues building permits in Manitoba
Building permits in Manitoba are issued locally:
- City of Winnipeg: the city’s permit office reviews and inspects buildings within city limits.
- Other cities and towns such as Brandon, Steinbach, Winkler and Portage la Prairie have their own building departments.
- Rural municipalities: many are served by a planning district or a shared building inspection service, so your permit may come from the district office rather than the municipal office.
Zoning is a separate step from the building permit. Your municipality or planning district will confirm whether the use is allowed, the setbacks, the maximum size and height for accessory buildings, and whether a development permit or conditional use approval is needed first.
The Manitoba Building Code
Manitoba adopted the National Building Code of Canada 2020, with Manitoba amendments, as the Manitoba Building Code effective January 1, 2024. Permit applications made on or after that date are reviewed under the new code.
For a pre-engineered steel building, the code sets the structural loads the building must be designed for: snow, wind, rain and, for heated buildings, energy efficiency requirements. The engineer designs the frame, purlins, girts, cladding, anchor bolts and foundation reactions to those loads at your exact location.
Farm buildings in Manitoba
Farm buildings get special treatment in Manitoba. Under the Manitoba Building Code, small farm buildings under 600 m² (about 6,450 sq ft) and three storeys or less are not regulated by the building code. Larger farm buildings are covered, and the 2020 code updated the requirements for them for the first time in decades.
Even when the building code does not apply, your municipality’s zoning bylaw usually still does, including setbacks from property lines, roads and other buildings. And a farm building still needs to be engineered for Manitoba snow and wind: an exempt building that collapses under a drift is still a loss. Our article on questions farmers should ask before building in steel covers what to check before you buy.
Snow, wind and deep frost
Manitoba’s climate drives the design of every steel building in the province:
- Snow and drifting. Open prairie means wind-blown snow drifts against walls, lower roofs and nearby buildings. Engineers design for these drift loads, not just the snow on a flat roof.
- Wind. Open, flat sites have high wind exposure, which affects bracing, cladding fasteners and especially large overhead doors.
- Deep frost. Frost penetrates deep in Manitoba winters, so foundations must be designed to prevent frost heave. See our guide to frost depth and steel building foundations.
- Cold and condensation. Heated shops need proper insulation and a vapour barrier to avoid condensation dripping from the roof in winter.
Documents you will usually need
Most Manitoba building departments will ask for:
- a site plan with the building location, property lines, setbacks and access;
- engineered building drawings sealed by an engineer licensed with Engineers Geoscientists Manitoba;
- foundation drawings showing footings or slab, frost protection and anchor bolt layout;
- the building use and occupancy, especially for commercial or public buildings;
- energy code information if the building will be heated.
For commercial, industrial and larger buildings, expect a more detailed review, and sometimes an architect as well as an engineer. Our guide to steel building foundation drawings explains what the foundation package includes.
Step-by-step permit process
- Confirm zoning and setbacks with your municipality or planning district.
- Request a quote with your postal code, size, use, doors and heating plans.
- Approve the design and receive engineered building and foundation drawings.
- Apply for the building permit (and development permit, if your area requires one).
- Answer plan review comments from the building official.
- Build the foundation and book the required inspections.
- Erect the building and complete final inspections.
Common delays and how to avoid them
- Starting with the wrong size. Check the maximum accessory building size in your zone before you design.
- Missing site information. Unclear setbacks, drainage or access lead to resubmissions.
- Foundation not matching the building. The foundation must match the engineered reactions and anchor bolt layout. See how engineering errors increase costs.
- Leaving it too late. Spring is the busiest season for permits and contractors, so apply over the winter for a spring build.
How Tower Steel Buildings helps in Manitoba
Tower Steel Buildings supplies engineered steel buildings across Manitoba, including garages, shops, farm buildings and commercial buildings. Every building is designed for the snow and wind loads at its location, and the package includes the drawings you need for your permit application.
Share your postal code, size and use, and we will prepare a project-specific quote. You can request a quote online or plan your layout in our 3D building designer.
Frequently Asked Questions
Do I need a permit for a steel building in Manitoba?
Most garages, shops and commercial steel buildings need a building permit from your city, town or planning district. Small farm buildings under 600 m² and three storeys or less are not regulated by the Manitoba Building Code, but zoning and setback rules usually still apply.
Which building code applies in Manitoba?
Manitoba adopted the National Building Code of Canada 2020, with Manitoba amendments, as the Manitoba Building Code effective January 1, 2024.
Who issues building permits outside Winnipeg?
Outside Winnipeg, permits come from your city or town, or for many rural municipalities from the local planning district or shared building inspection office.
Do farm buildings in Manitoba need engineered drawings?
Small farm buildings may not need a building code review, but they still need to be engineered for Manitoba snow and wind loads. Lenders and insurers also often ask for engineered drawings.